Tudor Gold Corp. Completes 2025 Exploration Program at Treaty Creek
Tudor Gold is pleased to announce the completion of the 2025 exploration program at its 80%-owned Treaty Creek Project.
Drilling Highlights
Results from the fifth and final drillhole from the Program are reported below.
- Hole GS-25-191-W1 intersected a northeastward extension of the 300 Horizon Zone ("300H"), linking mineralized intercepts within the 300H and 300 North Zone ("300N") along two potential SC-1 Zone structural corridors.
Mineralized Intercepts
- 1.37 g/t gold, 4.09 g/t silver and 0.01% copper (1.43 g/t gold equivalent ("AuEQ")) over 23.80 meters (m), including:
- 1.63 g/t gold, 4.89 g/t silver and 0.02% copper (1.70 g/t AuEQ) over 10.70m
- 1.76 g/t gold, 1.74 g/t silver and 0.01% copper (1.80 g/t AuEQ) over 6.80m
- 1.88 g/t gold, 1.71 g/t silver and 0.01% copper (1.91 g/t AuEQ) over 5m
Author's summary: Tudor Gold completes 2025 exploration program.
more
Goldseiten — 2025-11-03